105 – Exceptional apartments in the first-class residential and hotel complex in Miami
From $ 322.000
105 – Exceptional apartments in the first-class residential and hotel complex in Miami - 1
105 – Exceptional apartments in the first-class residential and hotel complex in Miami - 2
105 – Exceptional apartments in the first-class residential and hotel complex in Miami - 3
105 – Exceptional apartments in the first-class residential and hotel complex in Miami - 4
105 – Exceptional apartments in the first-class residential and hotel complex in Miami - 5
105 – Exceptional apartments in the first-class residential and hotel complex in Miami - 6![]()
Request more info
ID: 105
Reference
Property Description
Exceptional apartments for sale in the first-class residential and hotel complex “Legacy” in the Miami Worldcenter, Florida. The uniqueness of the complex consists in is combination of the 274 luxury apartments (floors 26-39) with 256 room of the hotel, the first luxury hotel in the downtown of Miami. The complex is equipped with a congress and exhibition center, first-class restaurants, with brand name shops that guarantee the highest demand for property rental throughout the year.
The “Legacy” is highlighted in:
- the possibility of renting your property without restrictions
- a spacious atrium on the rooftop and the possibility of organizing large events
- first international business lounge in Miami
- first Medical Health and Performance Center in Miami
- Microlux® design in the decoration of rooms and apartments
- Miami’s largest urban pool at an altitude of 152 m
- exclusive brands of furniture for common areas
- the synagogue with kosher cuisine
There are 4 apartment modifications presented for sale:
- Studios / 1 bath, 362 sq.ft. (34 m2)
- Apartments with 1 bedroom / 1 bathroom, 519 sq.ft. (45 m2) with balcony 32 sq.ft. (3 m2) or without balcony
- Apartments 2 bedroom / 2 bathrooms, 811-911 sq.ft. (63-73 m2) with 125 sq.ft. (12 m2) terrace
- Duplex 2 bedrooms / 2 bathrooms, 950 sq.ft. (88 m2)
Gradual deposit structure during construction.
Delivery is scheduled for the 2nd quarter of 2023.
Extra Features
Floor Plan